Manual position indicator

1- Kit components

2- Complete opening of the valve

3- Disassembling of the handwheel

4- Assembly index on the bonnet

5- Assembly Cap + index on the valve

6- Assembly in the furrow of the bearing nut

7- Stem places from there in the notch of the bearing
nut and the index

8- Installation of the handwheel and its
fixing.

Manual position indicator

CHOICE OF PRODUCT
Headstock with indicator
PRODUCT FAMILY
ACCESSORIES
ACCESSORIES
RANGE / MARK ®
Accessories VALVES
Main features

This apparatus installed on a valve euro 20 makes it possible to visualize if this valve is opened or closed.

Euro 20 with position indicator equips the general circuits with raw water filtered or drinkable of the factories sites.

The position indicator supplements a valve installed on an overhead main, thus a valve with closing clockwise.

Range

4 types of indicator cover the range Euro 20 DN 40 up to 300mm

Material and coating

ItemDesignationMaterialCoating

1

Cap

Stainless steel 316L

zinc dichromate

2

Index

Brass

-

3

Stem

Stainless steel

-

4

Screw and washer

Steel class 8/8

zinc dichromate

Installation, maintenance

Packaging

KIT position indicator is packed in a plastic bag.

It’s installed on a standard valve closing clockwise with a operating handwheel.

The handwheel is not included in the KIT

Each type of position indicator can be installed on several DN of Euro 20 gate valves

For each DN the number of turns to close is different, the index gives an indication of wedge position, the valve Euro 20 must always be completely opened or closed.

To consider a release on the top of the valve to install the position indicator.

This release must be at least of 0,5 times the overall dimension H of position indicator.

To consider the greasing of the operating cap and nut.

Hand wheels type closing clock

Procedure of assembly

1- Kit components

2- Complete opening of the valve

3- Disassembling of the handwheel

4- Assembly index on the bonnet

5- Assembly Cap + index on the valve

6- Assembly in the furrow of the bearing nut

7- Stem places from there in the notch of the bearing nut and the index

8- Installation of the handwheel and its fixing.

Solutions