Case study
Davyhulme Waste Water Treatment Works
| City | Ramsgate, Kent |
| Country | South East |
| Year | 2016 |
| Features | Large Diamatre Pipes |
| Markets | Sewerage |
| Contractor | Morrison Utility Services and Galliford Try joint venture known as MGjv |
| Company | Southern Water |
Project Specification
Package:
-
26 1800mm Integral pipe
-
50 1800mm cast fittings
-
PUX coated due to aggressive native soil
-
Raised sections to be laid in piled plinths
-
Ductile Iron requiring 1 no plinth per pipe offered savings versus steel which would require a greater number of plinths
Videos