Installation instructions for Flange adaptor eQ+ automatic restrained for PVC - PE
Technical design
Technical design
Features
Reliability, performance, practicality :
- Automatic flange adaptor
- DN40 - 225 PFA 16 bars
- PN10 or PN16 - EN 1092-2
- Angular deviation ± 3°
Field of application :
- Drinking water
- Irrigation
- Fire protection
- Water treatment plant
| Type of adaptor | Compatibility with PFA 16 | ||
|---|---|---|---|
| PVC-U | PVC-BO* | HDPE | |
| Locked | X | X | X |
Preparing for installation :
- Make a straight, perpendicular cut and deburr. Make sure there are no debris.
- Do not chamfer.
- For installation on 200 and 225 HDPE pipes, use a reinforcement ring before installation (see table below).
| Reinforcement ring for 200 and 225mm HDPE pipe | |
|---|---|
| Reinforcement ring for HDPE pipe OD 200, SDR 17, PFA10 | MBM20QGBZ |
| Reinforcement ring for HDPE pipe OD 200, SDR 11, PFA16 | MBM20QHAZ |
| Reinforcement ring for HDPE pipe OD 225, SDR 17, PFA10 | MBM22QGBZ |
| Reinforcement ring for HDPE pipe OD 225, SDR 11, PFA16 | MBM22QHAZ |
Assembly :
- Insert the adaptor without disassembling it, up to the stop (1), by pushing on the gasket. Once the adaptor is in place, remove the pre-cut cardboard ring. (2)
- Install and tighten the fasteners according to the instructions (see reverse side). Ensure that the flanges are parallel.
Recommendations
- Tighten the screws according to the recommendations provided.
- To maintain the product’s integrity, it is recommended that you install the fasteners with washers.
| Tightening torque for bolts | |||
|---|---|---|---|
| OD/DE | PN | Ø bolts | Torque (N.m) |
| 40 to 125 | 10-16 | M16 | 60 |
| 140 | 10-16 | M16 | 100 |
| 160 to 225 | 10-16 | M20 | 100 |
Bolt tightening sequence
Steel bolts Class 6 .8 mini
Assembling a part between two adaptor :
- First, tighten the locked adaptor.
- Then, tighten the simple adaptor.
When using a shut-off valve, the locked Quick should preferably be installed upstream of the equipment.
Vertical assembly (locked PVC-PE adaptor)
The vertical assembly is only possible with a pipeline element anchored above the pipe.
SG PAM Canalisation assumes no liability in the event of improper use or use contrary to the instructions.
The risk assessment of installation conditions and their management are the responsibility of the company in charge.