Surface box PAVA

Installation - Surface box PAVA

Application
Product family
Surface box

Features

Initial installation:

  • Compact at support level.
  • Cut the tube lengthening-piece.
  • Clean well the tube lengthening-piece until the operating nut.
  • Level.
  • Maintain in place with concrete, cement or similar sand-gravel mix.
  • It is recommended to install the surface box as delivered without using its extension.
NP_BAC_PAVA

Roadway repair work:

  • Screw the head to release the necessary space with the passage of surfacing mill.
NP_BAC_PAVA
  • Check the report of cleanliness of the tube lengthening-piece until the operating nut.
  • Regulate in height by unscrewing of the head.

Extension: rotation of the head counter-clockwise

PAVA 10 and 14 = 20 mm by tour

PAVA 19 = 40 mm by tour

NP_BAC_PAVA

Documents